A. Start-up preparation
1 . Make sure the tool Already Ready To Operated
2 . Make sure Manhole Bottom Already Closed Meeting
3 . Open Drain Steam Heating And Air Compressor
4 . Close Manual Valve Compressor Enters Into The Tank Na2SO4 Up Down
5 . Make sure Manhole Over Charging Sodium In Good Condition ( Can Open Close )
6 . Make sure Hoise Crane Can Operated
B. How to start up
1 . Open mp Steam Line Heaters
2 . Start Compressors What's In the Rb - 5 More With Less Pressure 5 Bar
3 . Open Air Floor Instruments What's In 2 Rb - 6
4 . Open manual Valve What's In Charge Tank ( Valve Venting )
5 . Open the On / Off Valve Air Wearing Instruments Manual
6 . Enter Sodium ( Na2SO4 ) 1 Ton Silo Into The Tank
7 . Close Manual Valve Venting And Close On / Off Valve Manually
8 . Close Compressor Tank Drain 75 % And Up Close Drain Line Compressor 0 %
9 . Open Manual Bottom Valve Compressor Enters Into The Tank Sodium
10 . If Pressure Valve Closed Back It Up
11 . Go to Top of Manual Valve Compressor More Less 40 % Pressure Will Hold Up 1-4 Bar
12 . If the pressure Ditangki It 0 % So Sodium In Tank It Out
C. How to Stop
1 . To do Flushing Line and Tank are incompressible
2 . If It's Really Clean stop compressor
3 . Open Drain Tank and Drain Line
4 . Stop the heating steam .