24 November, 2013

WORLD RECORD RB - 6 ABLE " RUNNING " 365 DAYS ( 12 MONTH MORE )

Recovery Boiler - 6 is one of the two boiler units operating in the RB - 1 ( RB - 5 and RB - 6 ) . Boiler is located in the area currently only Riau.And Recovery boiler - 6, listed as one of the boilers are capable of operated for 365 days , 12 months without any stop engine and trip since September 10, 2012 until now .


This success is a remarkable feat achieved by RB - 6 . It was supported by all parties, especially the DCS operator and operators in the field .
Just before RB - 6 can operate 8 months ( 253 days ) from the date of 6 September 2012 without any stop .


 ( Figure Profile RB - 6 )

Recovery boiler - 6, which is headed by Mr. Badot Krawang said that this achievement can not be separated from the contribution of all employees RB - 1 from head shift , team leader and all operators ( DCS & Field ) .
He added that the key to this success should be maintained as long as they can pay attention to the following aspects :

1 . Controlling replacement Shootblower
2 . Set the combustion air ( Primary , Secondary and Tertiary Water Flow )
3 . Charbed control in the furnace to avoid the Carry Over
4 . Conditions attention Spray gun ( Black Liquor System)
5 . Set the temperature Black Liquor


Then how can this be achieved , so that the RB - 6 Capable of operating for 1 year ?
Badot krawang confidently said , what is needed is :

1 . All employees must be generous and caring with which he worked
2 . Improve Team Work solid
3 . Good information between leaders and subordinates
4 . Improve Preventive maintenance performance
5 . Good in the air Controlling combustion ( combustion)
6 . Good operational maintenance
7 . Good in controlling Charbed


( Figure Team Work RB - 1 )
Any changes would have a new problem arises as a result of these changes , but not the issue that we fear but how we can confront and resolve the issue to our progress .

This achievement is not only the best se - APP group , but to the world level .

Hopefully this achievement can be a positive reference value for the existing recovery boiler in the APP Group in particular . 

Written by : Unknown ~ Lets talk about Power Plant,Recovery Boiler,Function,Black Liquor,Chemical Boiler,Electrostatic Precipator,Information and Blogging

WORLD RECORD RB - 6 ABLE " RUNNING " 365 DAYS ( 12 MONTH MORE )article was posted by Unknown on 24 November, 2013. Thank you for your visit and your willingness to read this article. Criticism and suggestions can you convey through the comment box.

1 komentar:

Unknown said...

TPM Rb6 bersama kita bisa yes yes yes by www.SobRydO.com

Post a Comment

Thank you for your comment

 
Design by Afridal Walda | Directed by Afridal Walda - Walda's Blog | Blog that provides information about the Recovery Boiler and supporting parts